Author Archives: Mike Hamlin

Verizon in the Area March 10th

You may see Verizon employees or Verizon contractors in the public right-of-way near or adjoining your property in the next few days. They may be taking photographs and some survey measurements. Their purpose is for gathering survey data related to the telecommunications poles.

Below is a list of streets where you might expect to see these individuals next week.

Tuesday, 3/10/2020

  • S. West End Ave.
  • Millersville Pike
  • School House Rd.
  • Manor House Ln.
  • Atkins Ave.
  • Hamilton Park Drive
  • Davis Drive
  • S. President Ave.
  • Springside Drive
  • West View Dr.
  • Abbeyville Rd.
  • Passey Ln.
  • Penrose Ave.
  • Roselle Ave.
  • Grandview Ave.
  • Charles Rd.
  • St. Joseph St.
  • Winthrop Dr.
  • Willow Street Pike

Planned Leaf Collection for Thursday December 19 2019

FINAL PICKUP DAY FOR ROUTE 4 All Areas North of Marietta Ave. between Marietta Ave. and Newton Rd. N., President Ave., and the 300–700 blocks of River Dr.  Also Thursday Signed Streets .

Reminder: FINAL DATES ARE PICKUP DATES – PILES MUST BE OUT BEFORE SUN UP ON THE FINAL COLLECTION DATE FOR YOUR NEIGHBORHOOD

FINAL DATES for leaf collection (weather permitting!)

  • Completed Monday, Dec. 16:  All areas between Columbia Ave., Marietta Ave., Race Ave., and 0 –200 block River Drive.
  • Completed Tuesday, Dec. 17:  All signed areas in East and West Township including Conestoga Woods area.
  • Completed Wednesday, Dec. 18:  All  signed areas in East and West Township finish Conestoga Woods area and unsigned streets in Hamilton Park Area.
  • Thursday, Dec. 19:  All areas between Marietta Ave. and Newton Rd. N., President Ave., and the 300–700 blocks of River Dr.
  • Friday, Dec. 20:  Areas west of Abbeyville Rd., School House Rd., N. Bausman Dr., Bausman, Gable Park, Bentley Lane, Chadwick Circle, Bean Hill Rd., Wedge Wood, Windolph Landing, Honeysuckle Ln., and Millrace Development

See the map here:  http://www.twp.lancaster.pa.us/wp-content/uploads/2011/03/Leaf-Pickup-Zone-Map.pdf

Reminder – ONLY LEAVES WILL BE PICKED UP – grass clippings and branches clog and can damage the machinery.  If your leaf pile contains grass clippings from your mower, or branches, WE WILL NOT PICK IT UP.  Thanks for your cooperation.

The No Parking enforcement on “signed streets” is extended through January 16, 2020 to allow for the sweeping of the streets after final leaf collection (weather permitting!). 

Planned Leaf Collection for Wednesday December 18th 2019

FINAL PICKUP DAY FOR ROUTE 2 and 3 Wednesday West Signed Streets and Route 2 and 3 Wednesday East Signed Streets and Unsigned Streets in Hamilton Park Area also finish Conestoga Woods and Blvd Area

Reminder: FINAL DATES ARE PICKUP DATES – PILES MUST BE OUT BEFORE SUN UP ON THE FINAL COLLECTION DATE FOR YOUR NEIGHBORHOOD

FINAL DATES for leaf collection (weather permitting!)

  • Completed Monday, Dec. 16:  All areas between Columbia Ave., Marietta Ave., Race Ave., and 0 –200 block River Drive.
  • Completed Tuesday, Dec. 17:  All signed areas in East and West Township including Conestoga Woods area.
  • Wednesday, Dec. 18:  All  signed areas in East and West Township finish Conestoga Woods area and unsigned streets in Hamilton Park Area.
  • Thursday, Dec. 19:  All areas between Marietta Ave. and Newton Rd. N., President Ave., and the 300–700 blocks of River Dr.
  • Friday, Dec. 20:  Areas west of Abbeyville Rd., School House Rd., N. Bausman Dr., Bausman, Gable Park, Bentley Lane, Chadwick Circle, Bean Hill Rd., Wedge Wood, Windolph Landing, Honeysuckle Ln., and Millrace Development

See the map here:  http://www.twp.lancaster.pa.us/wp-content/uploads/2011/03/Leaf-Pickup-Zone-Map.pdf

Reminder – ONLY LEAVES WILL BE PICKED UP – grass clippings and branches clog and can damage the machinery.  If your leaf pile contains grass clippings from your mower, or branches, WE WILL NOT PICK IT UP.  Thanks for your cooperation.

The No Parking enforcement on “signed streets” is extended through January 16, 2020 to allow for the sweeping of the streets after final leaf collection (weather permitting!).